Taihe station
Metro station in Guangzhou, China
Taihe 太和 | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Platform | |||||||||||
Chinese name | |||||||||||
Simplified Chinese | 太和站 | ||||||||||
Traditional Chinese | 太和站 | ||||||||||
| |||||||||||
General information | |||||||||||
Location | Guangcong Highway (G105), Dali Road, Kequan Road, Baiyun District, Guangzhou, Guangdong China | ||||||||||
Operated by | Guangzhou Metro Co. Ltd. | ||||||||||
Line(s) | Line 14 | ||||||||||
Platforms | 2 (1 island platform) | ||||||||||
Tracks | 4 | ||||||||||
Construction | |||||||||||
Structure type | Underground | ||||||||||
Accessible | Yes | ||||||||||
Other information | |||||||||||
Station code | 14 04 | ||||||||||
History | |||||||||||
Opened | 28 December 2018 | ||||||||||
Services | |||||||||||
| |||||||||||
Taihe station (Chinese: 太和站), is a station of Line 14 of the Guangzhou Metro. It started operations on 28 December 2018.[1]
The station has an underground island platform. Platform 1 is for trains heading to Dongfeng, whilst platform 2 is for trains heading to Jiahewanggang, along with 2 bypass tracks next to the stopping tracks.
Exits
There are 4 exits, lettered A, C, D and E. Exit E is accessible. All exits are located on Guangcong No. 3 Road.
Gallery
- Concourse
- Concourse culture wall artwork
- Exit A
- Exit C
- Exit D
- Exit E
References
- ^ "Line 14 Service Time". Guangzhou Metro. Guangzhou Metro. Retrieved 31 December 2017.
- v
- t
- e
Guangzhou Metro stations
- Jiahewanggang 2 3
- Baiyun Dongping
- Xialiang
- Taihe
- Zhuliao
- Zhongluotan
- Mali
- Xinhe
- Taiping
- Shengang
- Chicao
- Conghua Coach Terminal
- Dongfeng