Waaban Crossing
Road bridge in Kingston, Ontario, Canada
44°15′32″N 76°28′18″W / 44.258762°N 76.471801°W / 44.258762; -76.471801
The Waaban Crossing (known as the Third Crossing bridge during development) is a 1.2-kilometre crossing of the Cataraqui River in Kingston, Ontario, linking John Counter Boulevard on the western side of the river with Gore Road on the eastern side. Built at a cost of $180 million, the bridge was funded by equal contributions from the city, provincial, and federal governments.[1] The bridge opened to the public on December 13, 2022.[2]
See also
- La Salle Causeway – another crossing of the Cataraqui River