Senj Hydroelectric Power Plant
- View a machine-translated version of the Croatian article.
- Machine translation, like DeepL or Google Translate, is a useful starting point for translations, but translators must revise errors as necessary and confirm that the translation is accurate, rather than simply copy-pasting machine-translated text into the English Wikipedia.
- Do not translate text that appears unreliable or low-quality. If possible, verify the text with references provided in the foreign-language article.
- You must provide copyright attribution in the edit summary accompanying your translation by providing an interlanguage link to the source of your translation. A model attribution edit summary is
Content in this edit is translated from the existing Croatian Wikipedia article at [[:hr:Hidroelektrana Senj]]; see its history for attribution.
- You may also add the template
{{Translated|hr|Hidroelektrana Senj}}
to the talk page. - For more guidance, see Wikipedia:Translation.
- 216 MW
Senj Hydroelectric Power Plant is a large high-pressure diversion power plant harnessing the Lika and Gacka Rivers water in Croatia. Senj HPP has four turbines with a nominal capacity of 72 MW each[1] having a total capacity of 220 MW.
It is operated by Hrvatska elektroprivreda.[2][3]
Another unit of HE Senj is about to be built with the support of EU funds and HEP Croatian Energy Company. A construction on a billion dollar project is set to start in mid 2014 with completion dates around 2017 or 2018 at the latest. [4]
References
- v
- t
- e
This article about a hydroelectric power plant is a stub. You can help Wikipedia by expanding it. |
- v
- t
- e
This article about a Croatian building or structure is a stub. You can help Wikipedia by expanding it. |
- v
- t
- e