Northwester 2 Offshore Wind Farm
Belgian offshore wind farm in the North Sea
51°41′15″N 2°44′56″E / 51.6875°N 2.7488°E / 51.6875; 2.7488- 2020
- Offshore
- 40 m (130 ft)
- 51 km (32 mi)
- 12 km2 (4.6 sq mi)
- 219 MW
[edit on Wikidata]
Wind farm layout
Northwester 2 is an offshore wind farm located in the Belgian part of the North Sea. The wind farm was commissioned in 2020 and is the seventh offshore wind farm in Belgium. The farm is located between the Mermaid wind farm in the north and Nobelwind wind farm in the south.[1]
The wind farm consists of 23 Vestas V164 wind turbines with a capacity of 9.5 MW each, giving the farm a total capacity of 219 MW.[2][3]
See also
References
- v
- t
- e
Wind power
- Airborne wind energy
- By country
- History
- Land vehicles
- Offshore
- Turbines
- Windmill
- 2020s in wind power research
- Betz's law
- Blade element momentum theory
- Capacity factor
- Energy return on investment
- Energy storage
- Energy subsidy
- HVDC
- Hybrid power
- Laddermill
- Net energy gain
- Tip-speed ratio
- Variable renewable energy
- Virtual power plant
- Wind power forecasting
- Wind profile power law
- Wind resource assessment
- Wind power portal
- Category
- Commons
- Additional portals:
- Renewable energy
- Energy