Dhaka Mass Transit Company Limited
Company type | Government-owned company |
---|---|
Industry | Rapid transit |
Founded | 3 June 2013; 11 years ago (3 June 2013) |
Headquarters | Probashi Kallyan Bhaban (Level-14), 71, 72, Old Elephant Road, Eskaton Garden, Ramna, Dhaka , Bangladesh |
Area served | Dhaka metropolis and adjoining areas |
Key people | M. A. N. Siddique |
Owner | Government of Bangladesh |
Parent | Dhaka Transport Coordination Authority |
Divisions | Road Transport and Highways Division |
Website | dmtcl |
Transport in Dhaka |
---|
Streets |
|
Roads |
Bridges |
Rail transport |
Mass transit |
Structures |
|
Others |
|
|
|
Dhaka Mass Transit Company Limited, commonly known as DMTCL, is a government-owned company responsible for operating Dhaka Metro Rail, a mass rapid transit system in Dhaka and adjoining areas. The company was established on 3 June 2013 under the Companies Act 1994, a law that governs companies in Bangladesh.[1] Out of 5 metro lines planned by the DMTCL, the MRT Line-6 was inaugurated on 28 December 2022 by the Prime Minister Sheikh Hasina.[2]
Vision
Moving People, Saving Time and Environment [3]
Mission
To reduce the traffic congestion by providing a fast, safe, reliable, air-conditioned, time-saving, electricity-driven, environment-friendly and remote-controlled public transport system for Dhaka and its adjoining areas. [3]
Time-bound Action Plan 2030
Bangladesh Government has undertaken the following Time-bound Action Plan 2030 to establish a state-of-the-art robust Mass Rapid Transit (MRT) Network consisting of 6 (Six) Metro Rail routes which will have 104 stations along the total length of 128.741 kilometers line under Dhaka Mass Transit Company Limited (DMTCL). [3]
SL | Name of MRT Route | Phase | Projected year of completion | Type |
1 | MRT Line-6 * | First | 2025 | Elevated |
2 | MRT Line-1 | Second | 2026 | Elevated and Underground |
3 | MRT Line-5: Northern Route | 2028 | ||
4 | MRT Line-5: Southern Route | Third | 2030 | |
5 | MRT Line-2 | |||
6 | MRT Line-4 |
* In compliance with the Honorable Prime Minister's directives works for the extension of MRT Line-6 from Motijheel to Kamlapur is ongoing. [3]
Metro Rail Network Map for Dhaka and its adjoining areas
Route length and stations
The total length of Mass Rapid Transit or Metro Rail Network that is being implemented adhering the Time-bound Action Plan 2030 under Dhaka Mass Transit Company Limited (DMTCL) is 140.701 Kilometers. There will be 67 stations. The Route-based details are as follows: [4]
Name of MRT Line | Length in Kilometer [4] | Number of Station [4] | ||||
Total | Elevated | Underground | Total # | Elevated | Underground | |
MRT Line-6 | 21.26 | 21.26 | - | 17 | 17 | - |
MRT Line-1 | 31.241 | 11.369 | 19.872 | 21 | 07 | 14 |
MRT Line-5: Northern Route | 20.00 | 06.50 | 13.50 | 14 | 05 | 09 |
MRT Line-5: Southern Route | 17.20 | 04.10 | 13.10 | 15 | 04 | 11 |
MRT Line-2* | 35.00 | To be finalized after Feasibility Study | ||||
MRT Line-4 * | 16.00 | |||||
Grand Total | 140.701 |
* Approximate Length
Station Names and Route alignment of Metro Rail Lines under Mass Rapid Transit (MRT) Network of Dhaka
MRT Line-6 [5]
Uttara North – Uttara Center – Uttara South – Pallabi – Mirpur 11- Mirpur 10- Kazipara – Shewrapara – Agargaon – Bijoy Sarani – Farmgate – Karwan Bazar – Shahbagh – Bangladesh Secretariat – Motijheel – Kamlapur
MRT Line-1 [6]
- Airport Route: Airport - Airport Terminal 3 – Khilkhet – Nadda – Natun Bazar - North Badda – Badda – Aftab Nagar – Rampura – Malibag – Rajarbag – Kamlapur
- Purbachal Route: Joar Sahara – Boalia – Mostul – Sheikh Hasina Cricket Stadium – Purbachal Center - Purbachal East – Purbachal Terminal
MRT Line-5: Northern Route [7]
Hemayetpur – Baliarpur – Bilamalia – Amin Bazar – Gabtoli – Dar-us-Salam – Mirpur 1 – Mirpur 10 – Kochukhet – Banani – Gulshan 2 – Natun Bazar - Vatara
Line-5: Southern Route [8]
Gabtoli – Technical – Kallyanpur – Shyamoli – College Gate – Asad Gate – Russel Square – Karwan Bazar – Hatirjheel – Tejgaon – Aftab Nagar – Aftab Nagar Center – Aftab Nagar East – Nasirabad – Dasherkandi
MRT Line-2 (Proposed Route) [9]
- Main Line
Gabtoli – Dhaka Udyan – Mohammadpur Bus Stand – Jhigatola – Science Laboratory – New Market – Azimpur – Palashi – Dhaka Medical College – Gulistan – Motijheel – Kamlapur – Manda – Dakhshingaon – Damripara – Signboard – Bhuighor – Jalkuri – Narayangonj Zilla Sadar
- Branch Line
Gulistan – Naya Bazar – Sadarghat
MRT Line-4 (Proposed Route) [10]
Kamlapur – Sayedabad – Jatrabari – Shonir Akhra – Signboard – Chattogram Road – Kanchpur – Madanpur
References
- ^ Express, The Financial. "Metro rail company functioning without paid-up capital". The Financial Express. Retrieved 28 December 2022.
- ^ Tribune, Dhaka (21 December 2022). "PM Hasina will be first passenger of metro rail on Dec 28". www.dhakatribune.com. Retrieved 28 December 2022.
- ^ a b c d "At a Glance-Dhaka Mass Transit Company Limited". DMTCL Website. 2024-06-04. Retrieved 2024-06-04.
- ^ a b c "At a Glance-Dhaka Mass Transit Company Limited". DMTCL Website. 2024-06-09. Retrieved 2024-06-09.
- ^ "MRT Line-6 or First Elevated Metro Rail of Bangladesh". DMTCL Website. 2023-10-04. Retrieved 2024-06-04.
- ^ "Route Alignment of MRT Line-1". DMTCL Website. 2023-10-04. Retrieved 2023-10-04.
- ^ "Route Alignment of MRT Line-5: Northern Route". DMTCL Website. 2023-10-04. Retrieved 2024-06-04.
- ^ "Route Alignment of MRT Line-5: Southern Route". DMTCL Website. 2023-11-29. Retrieved 2024-06-04.
- ^ "Route Alignment of MRT Line-2". DMTCL Website. 2023-10-04. Retrieved 2024-06-04.
- ^ "Route Alignment of MRT Line-4". DMTCL Website. 2023-10-04. Retrieved 2024-06-04.
This article about transport in Bangladesh is a stub. You can help Wikipedia by expanding it. |
- v
- t
- e